Haigh Hall, Wigan

Overview MODA Contracting completed the full re-roof of Haigh Hall, a Grade II listed building of significant historical importance. Works were undertaken sensitively, maintaining the architectural integrity and historic character of the building while delivering a high-quality, technically appropriate roofing solution. Contract Value c. £400,000.00 Duration 14 months MODA Role Specialist Heritage Roofing Contractor Sector […]

Monarch House, Leeds

Overview MODA Contracting delivered a complex roof replacement project at Monarch House in central Leeds while the building remained occupied and operational. The scheme combined asbestos remediation, demolition, structural alteration and a new warm tapered roofing system within a highly restricted working area. Contract value £750,000 Duration 6 months MODA role Principal Contractor Sector Commercial […]

Mill Hill Industrial Estate, Peterlee

Overview MODA Contracting delivered a major multidisciplinary refurbishment and infrastructure scheme across a fully occupied industrial estate. The project combined extensive recladding, M&E and internal alterations, fire compartmentation, demolition and external infrastructure works. Contract Value c. £3 million Duration 18 months MODA Role Principal Contractor Sector Industrial refurbishment and recladding Scope of Works Delivery and […]

Rochdale Town Hall

Overview MODA Contracting delivered a technically demanding heritage roofing scheme at Rochdale Town Hall. Works were undertaken above priceless and irreplaceable historic ceilings, requiring exceptional care, controlled sequencing and strict site practices. Contract Value £1 million Duration 18 months MODA Role Specialist Heritage Roofing Contractor Sector Civic Heritage Scope of works Delivery and key challenges […]

Museum of Science and Industry

Overview MODA Contracting delivered the complete roofing package to the historic Power Hall at the Museum of Science and Industry in Manchester. The project combined extensive timber repairs and a modern airtight roof build-up with the sympathetic finish required for an important heritage building. Contract value £1.5m Duration 18 months MODA role Specialist Roofing Contractor […]

Royal British Legion – Cheshire

Overview MODA Contracting boarded and overlaid a failing circa 1,000m² flat roof above an operational building, meaning the works had to be completed while the building remained fully in use. A multi-layer felt roofing system was installed, with careful phasing and coordination to maintain safe access and minimise disruption to ongoing operations. Contract Value c. […]

The Beacon Centre – Manchester

Overview Turnkey reinstatement of a community facility following significant fire damage. MODA delivered the complete project, including demolition and sanitisation, building-envelope and roofing works and the subsequent internal refurbishment and fit-out. The six-month programme transformed the fire-damaged building back into a fully operational facility. Contract Value c. £650,000 Duration 6 months MODA Role Principal Contractor […]

Stonebridge House

Overview MODA Contracting delivered the complete remediation of a complex façade system at Stonebridge House. The scheme combined significant design development, regulatory coordination and technically demanding interfaces around existing windows and the building fabric. Contract value £650,000 Duration 6 months MODA role Principal Contractor with full design responsibility Sector Building safety / façade remediation Scope […]

Five Ashes Road – Chester

Overview BALCONY, WALKWAY & ROOFING REFURBISHMENT Extensive PMMA waterproofing works to balconies and walkways at an occupied residential property, followed by a further instruction to completely refurbish the main roof to achieve Part L requirements Contract value £330,000 Duration 5 weeks MODA role Principal Contractor Sector Commercial Roofing Scope of works Delivery and key challenges […]

Glasshouse Business Park – Wigan

Overview MODA was appointed to deliver the complete CAT A fit-out of two large office accommodation units, taking both spaces from shell condition through to completed CAT A standard. The works included full M&E design and installation, lift reinstatement and associated building and finishing works. MODA managed the design, coordination and construction process, delivering a […]